| Time: | Allow 40min -mark work from previous lesson | |
| Aim: | To create a perspective grid using a single measurement and three vanishing points. This lesson is to consolidate and further the notion of perspective 'scale'. That is, as things of equal size recede they appear smaller. This time we will use the CVP and a familiar and logical structure, a railway line. | |
| Materials: |
|
|
| Notes: | Construct margin and title box then:
a) the same light lines as in stage a, b, c, d, of the previous lesson until we get the lines shown above
b) this time we firm in the 'diagonals' which become railway line 'sleepers'. Note the more simplified method of construction.
c) keep adding sleepers until ...
d) after the student has completed the drawing to the stage above ask:
e) add the extra light lines on the ground (two horizontal and three to the CVP). We are going to build a station about 30mm (1,1/4") from track 60mm wide and
f) add the vertical lines 50mm (2") high and join to CVP
g) firm in the lines as shown and ask:
h) add the telegraph lines and poles and have the student determine their height and distance apart. Clean up and print in the title as shown. |
|
| Homework: | Complete the drawing adding a roof on the station, cactus, hills , train, birds.... | |